Wessex Safety Hour – 25th April 2017

Safety Hour Attendance Last Week – 63% green%  (Target = 67%)

Close Calls Raised – 37  (Target = 130)

% of Close Calls in <90’s – 87%  (Target = 80%)

 

Incidents last week

17/04/2017
Poole
Possessing Irregularity Item 34
Eastleigh ECR reported that a possible irregularity had occurred within won 3 item 34 part 7.
The ODM attended site and identified that the straps had been placed at 113m 65ch vice 113m 62ch due to a check rail.
The ECR had not made aware of the changes and it was likely that the B2 isolation documents had been incorrect for the past 3 nights.
This incident is subject to further investigation.
19/04/2017
Waterloo
Staff Accident
An E& P Engineer slipped whilst walking from Waterloo Station to an office in Paris Gardens and tripped on poor underfoot conditions as a result of ongoing building works.
The injured party twisted their right ankle.
First aid was administered by means of a bandage and an Ibuprofen tablet was taken for the pain.
The Golden Hour was applied and this became a lost time injury.
21/04/2017
Richmond
Staff Accident
Whilst walking to location case from the up platform, a member of S&T struck their head on a concrete section of a footbridge.
He was struck under the visor of his hard hat and experienced a headache and felt sick.
The Golden Hour was applied and there was no lost time.

Material

SAW Lunch Time Learning
SAW A4 Poster
SAW Suicide in Construction
SAW Suicide Prevention and Support on the Railway Pocket Handbook – 2017
SWR April Briefing 2017.dot

If you would like to raise a question about this call. Please feel free to comment on this post and it will be answered as soon as possible. If you would like to remain anonymous, please state in your comment and it will not be published.

A recording of this call can be found below:


If you are having problems with the player above, please click here.