The Health, Safety and Environment Period Cascade for Period 12 is now available. Please find information below:
Wessex HSE Cascade P12 (PowerPoint)
Wessex HSE Cascade P12 (PDF)
Support Material:
- Train Striking Welding Kit
- Shared-Learning-NRL19-04-RIDDOR-Dangerous-Occurrence-Signalling-wrong-side-failure
- Shared-Learning-NRL19-02-OTP-exclusion-zone-lighting-systems
- Shared-Learning-NRL19-01-RIDDOR-Burn-Injury-–-Use-of-hedge-trimmer
- Safety-Bulletin-NRB19-03-Person-struck-by-falling-over-head-wire
- Safety-Bulletin-NRB19-02-Near-miss-with-Track-Workers-Croxdale-Viaduct
- P10 1819 S.Cory RAAI Level 1 Investigation Best Practise Workshop slides
- Safety-Advice-NRA19-02-Long-Portable-Earths
- NR_L3_MTC_SE0220_04
- NR_L3_OPS_047_F3.27A Maxey CCTV LC 22.12.2018
- NR_L2_OHS_022 – Working at Height Standard
- Best practise evidence gathering for IO and Investigators.v2
- Lessons Learnt – Near Miss at Feltham 10-02-2019
- Action Calendar – March 2019
- Wessex App Cascade item
Front Line Focus 83 – January 2019