Wessex Safety Cascade Period 2 2018

The Health, Safety and Environment Period Cascade for Period 2 is now available.  Please find information below:

Wessex HSE Cascade P2 Final

Support Material:

Wessex Safety Cascade Period 6 2017

The Health, Safety and Environment Period Cascade for Period 6 is now available.  Please find information below:

Wessex HSE Cascade P6 Final

Copy of Transition Plan V1.1
Final Risk Sharing INFORMATION templates V3
Safety-Advice-NRA-17_06-Close-call-involving-conductor-rail-short-circui…
Safety-Advice-NRA-17_07-Collisions-within-possessions
Safety-Bulletin-NRB-17_15-Runaway-trolley
Safety-Bulletin-NRB-17_18-Advanced-lookout-struck-by-a-train
Safety-Bulletin-NRB-17_19-Electric-shock-to-member-of-staff
Safety-Bulletin-NRB-17_20-Manual-handling-incident-with-an-MC3-Frog-grinder
Wessex Route Information Sheet for 019 v9 Go Live V1.3

Wessex Safety Cascade Period 3 2017

The Health, Safety and Environment Period Cascade for Period 3 is now available.  Please find information below:

Wessex HSE P3 Final
LymeDisease_SignsAndSymptoms
Addlestone Line Blockage 24-05-2017
Safety-Advice-NRA-17_04-Defective-hydraulic-clamplock-hoses
TLP-072-Shared-Learning-Lewisham-Sub-Station
TLP-069-Shared-Learning-Metal-Tape-in-Contact-with-Live-Conductor-Rail
Safety-Bulletin-NRB-17_12-Fatality-at-Trenos-footpath-crossing

Wessex Safety Cascade Period 12 2017

The Health, Safety and Environment Period Cascade for Period 12 is now available.  Please find information below:

Wessex HSE P12 _ Final

Safety-Advice-NRA-17_01-Immediate-quarantine-of-Manitou-160-ATJ-Plus-and-160-ATJ-Plus-RC-based-MEWPs

Safety-Bulletin-NRB-17_04-Trespass-causes-severe-electric-shock-to-member-of-public

Safety-Bulletin-NRB-17_03-Smouldering-head-torch

Respiratory-Health-surveilliance-standard-briefing

Take 5_bc _p20_Network_March2017_FINAL

A4-Poster-Take5

A3Poster-Take5

NR_L3_MTC_RCS0216_SP11

Wessex Route Lessons Learnt Works Delivery 2 Injuries Rail Jacks 02_17

 

Wessex Safety Cascade Period 10 2017

The Health, Safety and Environment Period Cascade for Period 10 is now available.  Please find information below:

 

Wessex HSE Period 10 Cascade

365 Lighting guide

Chertsey CCTV Level Crossing Irregularity 05-01-2017

GERT8000-HB6 Iss 5

Safety-Bulletin-NRB-16_22-Plant-and-equipment-stored-in-tunnels

Wessex Route Lessons Learnt Slip Whilst Removing Fishplate Bolts Neck Injury Dec 16

Wessex Route Lessons Learnt W D Slip_Fall in Icy Depot 03_01_17 (2)

NR_L3_MTC_RCS0216_GA05
Shared-Learning-NRL-17_01-Serious-road-accident-on-M5

Wessex Safety Cascade Period 9 2017

The Health, Safety and Environment Period Cascade for Period 9 is now available.  Please find information below:

Wessex HSE Period 9 Cascade

VTS Implementation Presentation

VTS FAQs

VTS Discussion Pack

VTS Data Collection and Usage Assurance

DA Employee Presentation

DA FAQs

DA Manager Briefing Presentation

DA Poster A3

PPE Sizing Brochure

Wessex Route Lessons Learnt Electrical Flashover 091116 IMDM Outer V1.1

Working at Height – Nov 2016 Update

 

Wessex Safety Cascade Period 8 2016

The Health, Safety and Environment Period Cascade for Period 8 is now available.  Please find information below:

Wessex HSE Period 8 Cascade

Wimbledon ASC Trainee Signallers 12-11-16

NR/L3/MTC/RCS0216/GA20 – Working Adjacent to DC Electrified Rails

Safety Advice NRA 16/11 – Electric shock from Bussmann CamMaster fuse carrier

Safety Bulletin NRB 16/18 – Team members injured during isolation irregularity